Construction 11.08.2005
Construction is going well and on schedule. The exterior foundations are poured and most of the under ground utility work is complete. Also, the exterior masonry block fence wall is well underway.

Interior block wall

Property line block wall

Property line block wall

Property line block wall and rebar

Interior block wall

South foundation wall at steel column

South foundation wall at main entry

South foundation wall

Interior block wall

Pad footing with steel base plate and plumbing

Elevator pit

South foundation wall with pop-out for stair tower

Interior block wall with rebar

West foundation wall

Interior block wall

Property line block wall

Property line block wall

Property line block wall and rebar

Interior block wall

South foundation wall at steel column

South foundation wall at main entry

South foundation wall

Interior block wall

Pad footing with steel base plate and plumbing

Elevator pit

South foundation wall with pop-out for stair tower

Interior block wall with rebar

West foundation wall


