M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: July 2006

Friday, July 28, 2006

07.28.2006

The job is moving along. The drywall is almost all hung and taping has begun. The building has been wraped with TYVEK (moisture protector) and the lath is up and almost ready for stucco.


Second floor lobby ceiling



















Medical reception rooms














Medical exam room hallway



















Dental exam room













Second floor lobby













First floor lobby from second floor



















Second floor lobby ceiling













Elevator shaft and main staircase on second floor













Second floor lobby ceiling













Executive office hallway



















Executive office waiting area













Main entrance














Grant writing on second floor













Second floor lobby ceiling from first floor



















Wearhouse



















Store













Kitchen hood for commercial stove













Walk in refridgerator and freezer