07.28.2006
The job is moving along. The drywall is almost all hung and taping has begun. The building has been wraped with TYVEK (moisture protector) and the lath is up and almost ready for stucco.
Second floor lobby ceiling
Medical reception rooms
Medical exam room hallway
Dental exam room
Second floor lobby
First floor lobby from second floor
Second floor lobby ceiling
Elevator shaft and main staircase on second floor
Second floor lobby ceiling
Executive office hallway
Executive office waiting area
Main entrance
Grant writing on second floor
Second floor lobby ceiling from first floor
Wearhouse
Store
Kitchen hood for commercial stove
Walk in refridgerator and freezer
Second floor lobby ceiling
Medical reception rooms
Medical exam room hallway
Dental exam room
Second floor lobby
First floor lobby from second floor
Second floor lobby ceiling
Elevator shaft and main staircase on second floor
Second floor lobby ceiling
Executive office hallway
Executive office waiting area
Main entrance
Grant writing on second floor
Second floor lobby ceiling from first floor
Wearhouse
Store
Kitchen hood for commercial stove
Walk in refridgerator and freezer