06.27.2006
Here is what has been hapening over the past month and a half. Drywalll is begining and the roofis complete. Air conditioning units have been set on the roof as well.
Window Mock-Up
Roll Up Door at the Wearhouse
Steel Eyebrow
Tile Designing in the Office
Small Store
Low Roof over Foor Wearhouse
Drwyall in the First Floor Lobby
Steel Eyebrow
Steve Haglund, Project Superintendent, on the Forklift
DWP moving electric wires
Intake
Kindercare
Roll-Up Door at Food Wearhouse
Food Distribution from Warehouse
Loading Drywall to the Second Floor
Upper Roof with Fabric Underlayment
Scaffolding
Main Staircase
Clothing Distribution
Delivery of the Wearhouse Racking and Forklift
Skylights
Second Floor Lobby
North Elevation from Parking Lot
Air Conditioning Units
Warning on Air Conditioning Units
Wearhouse from Food Distribution
Light Switching on Second Floor
Window Mock-Up
Roll Up Door at the Wearhouse
Steel Eyebrow
Tile Designing in the Office
Small Store
Low Roof over Foor Wearhouse
Drwyall in the First Floor Lobby
Steel Eyebrow
Steve Haglund, Project Superintendent, on the Forklift
DWP moving electric wires
Intake
Kindercare
Roll-Up Door at Food Wearhouse
Food Distribution from Warehouse
Loading Drywall to the Second Floor
Upper Roof with Fabric Underlayment
Scaffolding
Main Staircase
Clothing Distribution
Delivery of the Wearhouse Racking and Forklift
Skylights
Second Floor Lobby
North Elevation from Parking Lot
Air Conditioning Units
Warning on Air Conditioning Units
Wearhouse from Food Distribution
Light Switching on Second Floor