Friday, January 27, 2006
Thursday, January 19, 2006
Friday, January 13, 2006
01.13.2006_Concrete Site Work
Concrete Swale for Parking Lot
(Left to Right)
Robert Lee, President, R.E. Lee Design and Construction
Steve Haglund, Project Superintendent
Jim Winchester, Landscape West, onsite concrete subcontractor
Concrete finishing at the outdoor clothing area
Outdoor clothing area
Outdoor clothing area
Outdoor clothing area
Thursday, January 12, 2006
01.11.2006_Sitework
Site from Pierce Street Entrance
(click image to enlarge)
(Left to right)
Ed Rose, Founder and President, M.E.N.D.
Marianne Hill, Executive Director, M.E.N.D.
Robert Lee, President, R.E. Lee Design and Construction
Concrete Sidewalk along North Facade
Underground Electrical Conduits
Interior CMU walls
Interior CMU Walls
Outdoor Clothing Area
Looking West towards Kitchen
Concrete Pour_12.28.2005
Concrete went in on the 28th of December. Luckly the rain held off until after the pour. About 16,000 square feet of concrete was poured in 16 hours.
Concrete Pump
Concrete Pump
Loading Dock at North West corner
Concrete finishing
(Left to right)
Steve Haglund, Project Superintendent
Steve Brown,President of Construction, M.E.N.D.
Robert Lee, President, R.E. Lee Design and Construction
Concrete Finishing
Steve Haglund
(Left to right)
Robert Lee, President, R.E. Lee Design and Construction
Ron Bach, President, Ron Bach Construction, Concrete subcontractor
Laser Screed Machine
Concrete Finishing
Laser Screed Machine
Concrete Finishing
Concrete Pump
Concrete Pump
Loading Dock at North West corner
Concrete finishing
(Left to right)
Steve Haglund, Project Superintendent
Steve Brown,President of Construction, M.E.N.D.
Robert Lee, President, R.E. Lee Design and Construction
Concrete Finishing
Steve Haglund
(Left to right)
Robert Lee, President, R.E. Lee Design and Construction
Ron Bach, President, Ron Bach Construction, Concrete subcontractor
Laser Screed Machine
Concrete Finishing
Laser Screed Machine
Concrete Finishing