Construction 11.08.2005
Construction is going well and on schedule. The exterior foundations are poured and most of the under ground utility work is complete. Also, the exterior masonry block fence wall is well underway.
Interior block wall
Property line block wall
Property line block wall
Property line block wall and rebar
Interior block wall
South foundation wall at steel column
South foundation wall at main entry
South foundation wall
Interior block wall
Pad footing with steel base plate and plumbing
Elevator pit
South foundation wall with pop-out for stair tower
Interior block wall with rebar
West foundation wall
Interior block wall
Property line block wall
Property line block wall
Property line block wall and rebar
Interior block wall
South foundation wall at steel column
South foundation wall at main entry
South foundation wall
Interior block wall
Pad footing with steel base plate and plumbing
Elevator pit
South foundation wall with pop-out for stair tower
Interior block wall with rebar
West foundation wall