02-20-2006_Wood Framing
The first floor is almost completely framed and the second floor floor joists are being installed. The building is really starting to take shape.

Looking at the clothing store from the nmain lobby

Inside the clothing store

Looking out from the clothing store to the main lobby

Doorway and window to the clothing sorting room

Food Distribution and offices

Canopy framing over the outdoor sorting area

Looking at the clothing store from the nmain lobby

Inside the clothing store

Looking out from the clothing store to the main lobby

Doorway and window to the clothing sorting room

Food Distribution and offices

Canopy framing over the outdoor sorting area







